We aim to design and construct a scale model steel bridge.

 

We are a team of engineering students from UBC who work together to design, fabricate, and construct a steel bridge defined by unique competition rules published each year. In the 2018 competitions, our bridge spanned a length of 17’ 4” and carried a total load of 2500lb without significant deflections. But we cannot achieve our goals alone. Find out how you can help!

 
 

Watch a time lapse of our bridge being assembled!

 

2018 construction

actual time: 9 minutes 30 seconds (3 builders)

2017 Construction

Actual time: 8 minutes 30 seconds (4 builders)

 

About

Learn more about our team, what we do, and our achievements at past competitions.

Learn More →

sponsor us!

Ready to take the next step? You can become a contributor to our cause, or participate yourself.

Find Out How →

 

UBC Steel Bridge is proudly powered by:

Platinum Sponsors

Gold Sponsors

Silver Sponsors

Bronze sponsors